Our Work
WestCan Projects Ltd. is a full service contractor specializing in professional consulting and construction services for resource-based industries. "Concept to Completion" is our motto. From engineering, design, environmental, construction, materials testing and erosion control, WestCan specializes in projects based in and around sensitive aquatic environments. We offer a "one stop shop" in services for our clients, which include forestry, mining, oil and gas, pulp and paper and transportation sectors.
Some examples of completed projects by WestCan are listed below.
|
|

|
CLICK HERE TO VIEW FORESTRY PROJECTS
Dunkley Lumber Ltd. |
Road Failure Control
WestCan provided expertise in dewatering, erosion control and excavation to control and cleanup of a major road failure. This included dewatering of a pond and removal and reclamation of a failed culvert. |
Timeu Forest Products Ltd. |
Bridge Design and Construction and Environmental Aspects
Prepared environmental assessments, plans and permits for the installation of a new 50m bridge near Whitecourt, AB. Conducted all agency liaison and Transport Canada referrals. Designed and installed bridge over Timeu Creek based on initial environmental site assessment and Environmental Management Plan and all provincial and federal legislation. |
Canadian Forest Products Ltd. |
Rock Revetment Survey Design and Quality Control
Prince George Sawmill Rock Revetment Survey Design and Quality Control of rock revetment construction. Completed Proponent Action Plan and DFO compensatory works for such undertakings. Provided liaisons on behalf of proponent to all environmental agencies. |
CLICK HERE TO VIEW OIL & GAS PROJECTS
Voice Construction / Conoco Phillips |
Isolation and Site Dewatering
Provision of expertise in isolating and pumping / dewatering of a stream for a bridge required at the Surmont II project in Fort McMurray, Alberta. |
Canadian Natural Resources Ltd. |
Bridge Replacement Survey and Design
Completed survey and design for 3 bridge replacements in the Fort St. John area in northwest BC. |
Talisman Energy Inc. |
Proponent Application Plan and Environmental Monitoring
Conducted preliminary field assessment and prepared a Proponent Application Plan for the Bullmoose Mountain Interconnect Pipeline Right of Way Scour Repair, located northwest of Tumbler Ridge, BC. |
Apache Canada Ltd. |
Inverness River and Sloan Creek Bridge Replacements
Prepared environmental assessments, plans and permits for two bridge replacements near Swan Hills, AB. Conducted all agency liaison and Transport Canada referrals. |
Petro Canada Ltd. |
Environmental Impact Assessment of the Pipeline and Power Line Right of Way (ROW No. IOGC-RW-4209) in the Clarke Lake Area, Fort Nelson Indian Reserve #2
Conducted preliminary wildlife assessment along the pipeline and power lines. Prepared final report describing observed findings during the initial assessment. |
CLICK HERE TO VIEW MINING PROJECTS
Western Coal Corporation |
Falling Creek Connector
WestCan provided environmental monitoring; erosion control including hydroseeding and sediment construction and control for the Willow Creek Mine project Falling Creek Connector. |
Plateau Minerals Corporation |
Cliff Creek / Angus Mac Property
Drafting and engineering requirements. |
Terrane Metals Corporation / Ledcor Construction |
Mt. Milligan
WestCan provided hydroseeding and broadcast seeding for the Mt. Milligan mining construction project near Fort St. James, BC. |
Galore Creek Mining Corporation |
Galore Creek Project
Provided environmental representation for all major Road and Bridge contractors on site. Also assisted NovaGold/Galore Creek Mining Corporation with professional counsel regarding environmental issues and Fisheries Authorization. Prepared emergency flood contingency plans, HADD plans and agency liaison for river crossings. Conducted songbird surveys. Conducted environmental monitoring and turbidity monitoring. |
Canadian Dehua International Mine Group Inc. |
Dehua Gething Coal Route Selection Feasibility Study
Environmental, engineering, geotechnical, social, archaeological, economic study to determine access route feasibility to transport coal from the proposed mine site, near Hudson’s Hope, BC. Project includes extensive consultation, research and field assessments for its completion. |
Peace River Coal |
Environmental Monitoring
Conducted initial site assessment for bridge installation over the unnamed creek at km 19.2 of the Peace River Coal Trend Bypass Road for Ruskin Construction Ltd. |
CLICK HERE TO VIEW PULP & PAPER PROJECTS
Canfor Pulp Corporation |
Drainage Management
Provision of a drainage management plan, construction of site drainage and installation of a culvert sump area for the Prince George Pulp Mill. |
Quesnel River Pulp Company |
Environmental Management Plan
The development of an environmental management plan that complies with the Code of Practice for Soil Amendments and annual maintenance for the pulp mill in Quesnel, BC. This project involves Soil Amendment Testing, Site Application Certification, and Annual Reporting. |
Canadian Forest Products Ltd. |
Sampling, Remediation & Recommendations
Water quality sampling in the Fraser River and remediation and recommendations for spill at Canadian Forest Products Ltd's Intercontinental Pulp and Paper Mill in Prince George, BC. |
CLICK HERE TO VIEW TRANSPORTATION PROJECTS
Yellowhead Road and Bridge |
Chilako River
WestCan designed and installed a rock revetment wall including erosion control blankets and plantings on the Lower Mud River Road to prevent further erosion from the Chilako River. |
Ministry of Transportation |
Highway 2 Road Detour Bridge Over Tupper Creek
Designed a 24.38m steel detour bridge near Dawson Creek, BC. Acquired all relevant design/environmental permits. Prepared environmental plans, traffic plans and quality management plans for works. Provided materials, machinery, supervision, environmental monitoring and labour to install the structure for Caribou Road Services. |
Government of Canada |
Moraine Creek Bridge and Wildlife Underpass
Prepared Environmental Protection Plan for new 100m steel bridge and 8m Wildlife Underpass in Banff National Park, AB. Acquired all relevant environmental permits and conducted environmental monitoring as required for Surespan Construction Ltd. |
Ministry of Transportation |
Cache Creek Highway 39 Detour Bridge Installation
Designed a 48.76m steel detour bridge near Fort St. John, BC. Acquired all relevant design/environmental permits. Prepared environmental plans, traffic plans and quality management plans for works. Provided materials, machinery, supervision, environmental monitoring and labour to install the structure. |
CLICK HERE TO VIEW MUNICIPALITIES PROJECTS
Municipality of Saanich |
Bilston Bridge Replacement
Prepared environmental assessments and plans, and obtained permits for the replacement of the Bilston Bridge in Saanich on Vancouver Island, BC. Conducted all agency liaison, turbidity monitoring and environmental monitoring during construction. |
City of Prince George |
Nechako River Boat Launch
Provided the City with environmental permitting, plans for the boat launch. Created the design of the boat launch based on the environmental parameters collected. Provided environmental monitoring and quality management throughout the duration of the project. |
CLICK HERE TO VIEW UTILITIES PROJECTS
Alta Gas |
Forest Kerr Run of the River Project
Contract environmental monitoring for the Forest Kerr Run of the River Hydro Electric Project construction in northwest BC. |
Canadian National Railway |
Environmental Direction and Guidance
Provided environmental guidance for the removal of a coal berm to ensure that no sediment-laden water entered a major watercourse in Prince George, BC. |
BC Hydro |
Nelson Kenney Creek Site Deactivation
Conducted emergency site deactivation after a culvert was washed out on a sensitive stream near Hixon, BC. Surveyed the site and prepared the necessary plans for environmental approval. Provided all materials, machinery, supervision and labour to deactivate the site. Incorporated fish compensation measures and bioengineering techniques at the site. All plans, permits and works were completed in a short period of time to limit the environmental impact. |
BC Hydro |
Giesbrecht Rd. Environmental and Design of several stream crossings
Prepared Proponent Application Plan based on field stream assessments. Conducted agency referrals for several stream crossings along a major power line near Prince George, BC. Also provided engineered designs, construction and monitoring for all of the crossings. |
|